Design and technical drawings: From 3 days to two weeks depending on the size of the collection.
Prototyping: 45 days for colored prototypes. 30 days for structure sample in black.
First production: 120 days for acetate frames, 100 days for metal and injected frames.
Re orders: 90 to 120 days depending on difficulty and raw material supply.
Injection tooling: 40 days.
These are general timings and actual timings should be confirmed with our company.